Project Name: Post and Rail fence removal and replacement
Location: Keysborough Dog Run Park
The City of Greater Dandenong required new fencing installed at a new Dog Park in Keysborough. This project required Otter Fencing to dismantle and dispose of 215 metres of existing post and rail fence, then install 318 metres of new extra heavy duty chain-link fencing.
The new fencing was constructed at 1200mm high with 125mm Square fine sawn timber posts and 40nb top and bottom pipe rails. Then finishing it off with 1030mm high heavy duty Black Fusion Bonded Chain-link for extra durability and protection.
Check below for images of the Works