DEA LIVI X 24V Sliding Gate Motor Kit – 900kg, 2 x Remotes

SKU: LIVI24V-9-1
Regular price $1,732.50 inc. GST $1,575.00 ex. GST
Sold as: Kit
Estimated lead time for this product is 10 - 15 days.

Shipping costs are not included.

Speak with an Otter expert!

The DEA LIVI X 9/24 is a 24V sliding gate operator for residential gates up to 900kg. Made in Italy with all-metal gears and an aluminium base, it uses an encoder to detect obstacles and reverse the gate, and its magnetic limit switches are set simply by placing magnets on the rack. Being 24V, it can run from a battery backup so the gate keeps working during a power outage, and it can be released manually with the supplied key.

  • Max gate weight: 900kg
  • Power supply: 24V DC (NET24N control board)
  • Gate speed: Up to 10 m/min
  • Max power: 110W
  • Duty cycle: 18 cycles/hr, 40 cycles/24hr (5m gate)
  • Pinion: M4 (Z16)
  • Limit switches: Magnetic
  • Protection rating: IP44
  • Operating temperature: -20°C to +50°C
  • Application: Residential
  • Includes: LIVI X 24V operator with control board, 2 x 4-channel Ziggy remotes

Pair with our Steel Core Nylon Gear Rack (M4) and DEA photocells for a complete, compliant install.

  • Type Gate Automation
  • Vendor Downee
  • SKU LIVI24V-9-1
  • Package Length 420 mm
  • Package Width 300 mm
  • Package Height 340 mm
  • Alternative Code LIVI24V-9-1
We deliver directly to your site or business address.
  • Flexible Delivery Options
    Delivery times will be confirmed at the time of booking and may vary depending on location and conditions.
  • Crane-Assisted Unloading
    HIAB crane truck delivery is available if no forklift is on-site. Please let us know your preferred unloading method when booking.

Freight Services
If you require fencing materials delivered to your business or job site, we offer a range of flexible and reliable freight options across Melbourne, regional Victoria, and interstate locations.

Please Note:

  • Additional handling charges may apply for remote areas, restricted access sites, or non-standard unloading requirements.
  • It is essential to inform us in advance if there is no forklift on-site so we can arrange appropriate unloading equipment (e.g., HIAB crane).

Recent projects