DEA Swinger (Geko) 24V Double Swing Gate Motor Kit – 2 x Remotes

SKU: GEKO-DBL-1
Regular price $2,589.40 inc. GST $2,354.00 ex. GST
Sold as: Kit
Estimated lead time for this product is 10 - 15 days.

Shipping costs are not included, and a pallet is required to ship this safely.

Speak with an Otter expert!

The DEA Swinger (sold in Italy as the DEA Geko) is an articulated-arm 24V swing gate operator for gates up to 250kg or 2.5m per leaf. All-metal internals give it strength and long-term reliability, and integrated mechanical stops set the open and closed positions. Being 24V it is compatible with DEA battery backup and solar kits.

  • Max leaf: 250kg or 2.5m per leaf
  • Power supply: 24V DC
  • Max power: 80W
  • Max torque: 180Nm
  • 90° opening time: 16 sec
  • Duty cycle: 20 cycles/hr, 60 cycles/24hr
  • Protection rating: IP44
  • Operating temperature: -20°C to +50°C
  • Application: Residential
  • Includes: 2 x Swinger 24V operators, control board, 2 x 4-channel Ziggy remotes
  • Arms: Sold separately (slide arm, articulated arm or rubber riser for rising hinges)

Leaves over 2m require an electric lock. Add photocells and a battery backup kit for a safer, uninterrupted installation.

  • Type Gate Automation
  • Vendor Downee
  • SKU GEKO-DBL-1
  • Package Length 600 mm
  • Package Width 450 mm
  • Package Height 350 mm
  • Alternative Code GEKO-DBL-1
We deliver directly to your site or business address.
  • Flexible Delivery Options
    Delivery times will be confirmed at the time of booking and may vary depending on location and conditions.
  • Crane-Assisted Unloading
    HIAB crane truck delivery is available if no forklift is on-site. Please let us know your preferred unloading method when booking.

Freight Services
If you require fencing materials delivered to your business or job site, we offer a range of flexible and reliable freight options across Melbourne, regional Victoria, and interstate locations.

Please Note:

  • Additional handling charges may apply for remote areas, restricted access sites, or non-standard unloading requirements.
  • It is essential to inform us in advance if there is no forklift on-site so we can arrange appropriate unloading equipment (e.g., HIAB crane).

Recent projects